Birwelco USA

Fruitful Relationship With CF Fertilisers Continues to Blossom

28 February 2018

Fruitful Relationship With CF Fertilisers Continues to Blossom

Birwelco has redesigned a reform gas and steam superheater for CF Fertilisersí Ince site, in Cheshire.

The unit will then be manufactured and assembled at Unit Superheater Engineering, along with supporting pipework and ancillaries, with the superheater consisting of chrome and 304 stainless steel piping.
The Unit Engineers and Constructors team will carry out the removal of the existing superheater and will also go on to bid for the installation of the new superheater.
This project is the continuation of an established relationship between USE and CF Fertilisers, and the involvement of our personnel from Birwelco, USE and UEC teams illustrates how valuable it is to be able to call upon a range of specialist expertise from within our group.
The superheater replacement will be delivered to the site ahead of a shutdown in September this year.


« Back to News

Latest News